Noida, Ghaziabad, Meerut +91-9310414476 sunprabhassolar@gmail.com
We don't just install solar—we deliver precision-engineered systems built by the best minds in the industry. From consultation to installation and after-sales support, we ensure maximum savings, reliability, and long-term performance. Because in solar, quality of installation = performance for 25 years.
Know exactly how much you save with solar panels. Get upfront cost, subsidy amount, and your final investment.
Central + State Subsidy (Uttar Pradesh)
| System Capacity | Central Gov Subsidy | State Subsidy (UP)* | Total Subsidy |
|---|---|---|---|
| 1 kW | ₹30,000 | ₹15,000 | ₹45,000 |
| 2 kW | ₹60,000 | ₹30,000 | ₹90,000 |
| 3 kW | ₹78,000 | ₹30,000 | ₹108,000 |
| 4-10 kW | ₹78,000 | ₹30,000 | ₹108,000 |
📍 *Additional Subsidy for Uttar Pradesh residents only. Terms & conditions apply.
Average Cost + Subsidy = Your Net Investment
| System Size | Avg Cost (₹) | Subsidy* (₹) | Net Cost (₹) | Units/Month |
|---|---|---|---|---|
| 3 kW | ₹1,80,000 | ₹54,000 | ₹1,26,000 | ~400 units |
| 5 kW | ₹3,00,000 | ₹78,000 | ₹2,22,000 | ~650 units |
| 10 kW | ₹5,50,000 | ₹1,00,000* | ₹4,50,000 | ~1,300 units |
⚠️ *Subsidy varies by state & eligibility. 10kW max subsidy applicable for residential. Contact us for exact calculation.
Save up to ₹50,000+ per year on electricity bills with a 5kW solar system.
Most solar problems happen due to poor installation. Our expert engineers design for maximum efficiency. Our skilled technicians ensure zero performance loss. Our professional installation team builds strong, weatherproof, long-lasting systems.
Pooja Jain: +91-8860068456 | Pratul Jain: +91-9310414476
We design systems for maximum efficiency & actual output
Precision installation ensures zero performance loss
Strong structures, proper wiring, long-lasting systems
Your electricity becomes almost FREE after 3–4 years
Convert sunlight into electricity and power your home or business seamlessly, Book Your Free Consultation Today →
"Professional team, smooth installation, and huge savings. My bill dropped from ₹6,500 to ₹700. Engineers explained everything clearly."
"No hidden costs, no delays. The team delivered perfect work on time. Our factory's electricity bill reduced by 85% within the first month itself."